Design-Build P401V Traffic Mitigation Measures, Gates 3 & 4, National Naval Medical Center, Bethesda, MD

  • Design/ Build automated Entry Control Facilities (ECFs) at Gates 3 and 4
  • ECFs objective to secure installation from unauthorized access, to intercept contraband, and maximize traffic flow
  • Features: Guard Booth situated on an island between inbound and outbound lanes, and canopied for security checks. The Guard Booth included one guard house measuring approximately 7’ x 21’, toilet, storage closet, and an emergency power generator
  • Contract Value $5.9 Million

Work services included:

  • Geotechnical investigation
  • Demolition
  • Excavation
  • Underground utilities
  • Grading
  • Concrete foundations
  • Masonry
  • Framing and metal deck roof panels
  • Plumbing
  • HVAC
  • Electrical
  • Data and communications
  • Drywall
  • Plumbing fixtures
  • Casework and countertops
  • Non-porous sheet rubber flooring
  • Interior/Exterior painting and wall finishes
  • Roadway paving, striping, and signage
  • Sidewalks/Curb & Gutters
  • Landscape and irrigation
  • Storm sewer and drainage conveyance systems